Skip to main content

Lates company disclosures

  • Awarded new contract at the Viking Age Museum

    Statsbygg and AF Gruppen have entered into an agreement for the execution phase of the partial refurbishment of the old Viking Ship Museum at Bygdøy. The total contract value is estimated at NOK 123 million excluding VAT.

    Published: 02.02.2026

  • Rehabilitation of the Bjølsegrøvatn Dam

    Statkraft Energi has announced its intention to enter into a contract with AF Gruppen for the rehabilitation of the Bjølsegrøvatn dam. The agreement is an execution contract and has an estimated value of NOK 400 million excluding VAT.

    Published: 02.02.2026

  • Building vehicle preparation centre in Drammen

    Strøm Gundersen, a company within AF Gruppen, has entered into a contract to build a new vehicle preparation centre, including an administration building and a car park, at Holmen in Drammen.

    Published: 16.01.2026

  • NOK 11 million boost for mass-produced concrete foundations

    The Research Council of Norway has awarded NOK 11 million (~1 MEuro) to develop large‑scale production of concrete foundations for offshore wind.

    Published: 07.01.2026

Latest Updates from AF Gruppen

  • AF-posten artikkel
    Breakthrough for «Laila»

    After an 11‑kilometre journey through the bedrock beneath Oslo, the tunnel boring machine «Laila» reached its destination on January 20.

    Published: 27.01.2026

  • AF-posten artikkel
    The Final Lift

    Two of the last platforms from the LOGGS and CMS satellite fields in the North Sea are removed offshore.

    Published: 09.01.2026

  • AF-posten artikkel
    12,000 tonnes. ±5 mm tolerance. One flawless operation.

    With a custom-engineered solution and millimetre-level precision, the 11,640-tonne Eider Alpha topside was safely offloaded at AF Environmental Base Vats.

    Published: 03.11.2025

  • AF-posten artikkel
    Magic at the construction site

    The leader of Betonmast Oslo is driven by employee satisfaction, environmental initiatives, and outcomes at the construction site.

    Published: 14.01.2025