Skip to main content
Project status

Ekofisk Cat III

Engineering, preparation, removal, and disposal (EPRD) of the Ekofisk Field. 

Structures were brought ashore to AF Environmental Base Vats in Norway, where over 95 % of the received materials (such as steel for rebar and organic/marine growth converted to topsoil/compost) were recycled, and hazardous waste was safely disposed of.

About the project

Structures were brought ashore to AF Environmental Base Vats in Norway, where over 95 % of the received materials (such as steel for rebar and organic/marine growth converted to topsoil/compost) were recycled, and hazardous waste was safely disposed of.

Project type
Decommissioning
Contract type
EPRD
Project status
Completed
  • CustomerHeerema (HMC) for Conoco Philips
  • 36 000Tonnes
Business unit