Skip to main content

Wastewater Treatment Plant in Knislinge

AF Bygg Syd is constructing a new wastewater treatment plant in Knislinge, Östra Göinge Municipality, on behalf of Skåne Blekinge Vattentjänst AB (SBVT).

Project status

      Mar 2025
      Apr 2027

      The construction of the new treatment plant is an important step toward ensuring sustainable and efficient wastewater services for the region.

        AF Gruppen

        After many years in operation, the existing plant will be replaced by a modern facility on the same site. During the construction period, the current plant will remain in operation until the new one is commissioned.

        The new facility will treat wastewater from the urban areas of Knislinge, Broby and Sibbhult, as well as the surrounding areas. It is being designed for a maximum average weekly load of approximately 15,500 population equivalents (PE).

        The project is being carried out as a design‑build contract and includes all construction and groundwork, as well as mechanical, HVAC and electrical installations, along with engineering and design services. Building this new wastewater treatment plant is an important step toward securing sustainable and efficient wastewater services for the future.

        Project info

        Customer: Skåne Blekinge Vattentjänst AB
        Contract type: Turnkey contract
        Entrepreneur: