Up to now, this has been the largest demolition project in Norway. The project encompasses the demolition of all structures and installations above and below ground at the refinery.
In connection with the E18 in Oslo between the Festning Tunnel and the Ekeberg Tunnel being joined together with a tunnel under Bjørvika and Bispevika, AF Decom has performed demolition work.
Demolition of the prior sulphuric acid production plant for Borregaard Industries Limited in Sarpsborg. The factory was located in Borregaard's industrial area.
Demolition and environmental clean-up of two large electrolysis halls, in connection with the expansion of SU 4.
The IKEA store at Slependen is undergoing a renovation and expansion. Step 1 of the new store, which was built around the existing store, was completed in 2006. In order to carry out steps 2 and 3, the original store and warehouse needed to be demolished.