The project included the whole work of replacing water and drainage pipes in kitchens and bathrooms.
The bathrooms were also upgraded with wetroom membrane, underfloor heating cables, concrete screed, floor and wall tiling and new ceiling. Prebad pipe cassettes were used. The pipe cassettes contain both water and drainage pipes. Wall-hung WC.